Works have started
So when they say night they do mean night. The top surface has been removed ready for resurfacing. The work in Vale Road also continues. Looks like they're digging around a lamp-post outside Lidl and this means blocking the pavement, which means creating a walkway on the road, which for some reason means blocking off the entire lane. Sure give it a buffer, but the whole lane; do they think this is a Speed Limit Applies road it's a 30mph. Closing the lane would be as if they'd shut down the left-bend from Lombard Street because of the work that went on outside the old Shuttle office.
0 comments:
Post a Comment