Thursday, September 18, 2008

The revamped Buftons

In an additional to this having sat next to it for a minute while waiting in Bridge Street (Minster Road lights roadworks still ongoing; what are they doing there?) I can confirm that the door frame has been added along with a door :-) The windows are now glazed and all the framework has been or is the process of being painted/varnished. The outer brickwork has been plastered up and at least one window has a room behind it 4-6 feet deep. Doesn't appear much for two months work, but then I'm betting they had to clear a load out from behind the windows.

0 comments: